Ayu Anggraeni Sibarani, Dewi Tria Setyaningrum and Sugeng Waluyo (2025) “Multi-Item Flow Shop Batch Scheduling with Two Stages Dedicated Machines to Minimize Total Actual Flow Time”, International Journal of Integrated Engineering, 17(1), pp. 140–153. Available at: https://journal.uthm.edu.my/index.php/ijie/article/view/14683 (Accessed: 7 November 2026).