Diugwu, I.A. (2017) “Modelling the Effect of Time Overrun and Inflation Rate on Completion Cost of Construction Projects in Nigeria”, International Journal of Sustainable Construction Engineering and Technology, 8(2), pp. 18–28. Available at: https://journal.uthm.edu.my/index.php/IJSCET/article/view/1542 (Accessed: 12 August 2026).